Power Train Projects Power Train Projects - Suppliers to OE Manufacturers

  Home                        News                        Company Profile                        Contact Us  
 

LSD & Non LSD Differential

Part Number: MA2927100D
 
The differential is available in a standard format or with LSD (limited slip differential).
 
To obtain maximum strength and reduce overall size the outer differential casing is manufactured from cast iron. To reduce weight Mazda simplified the construction of the differential and have adopted an aluminium alloy rear cover.

To enhance the feeling of direct drive when starting from a standstill and accelerating Mazda has rigidly attached the differential to the transmission by means of a power plant frame, please see image below.
Power Plant FrameThe LSD is better referred to as a Super-LSD because of its low torque bias ratio (2.0:1), utilising torque-sensing; this style of differential has been adopted to enhance all round performance and improved driving stability.
 
 
 
 
 
 
Technical Information:
 

Dimensions:
Dry Weight:
 
Final Drive Ration:
 
Oil Capacity:
330 x 205 x 265 (L/W/H mm)
30Kgs - Standard
TBC Kgs - LSD
3.9:1 - Standard
4.1:1 - Standard
3.727:1 - LSD
0.6 - 0.8ltrs (approx)

 

 

Photo Gallery

Image of Diff
Image of DiffImage of DiffImage of DiffImage of DiffImage of DiffImage of DiffImage of Diff

Product Information

In 2008 PTP signed a contract with Mazda Motors Europe (MME) to supply Mazda Powertrain and associated fitting kits to Original Equipment manufacturers. Please click here for more information and a listing of current products available.

OE Parts Supply

As vehicles manufactured by the global automotive industry become older the demand for components by them is reduced and in time the quantities required by the UK and European smaller niche OE Manufactures may fall below the minimum order quantity’s that larger OE suppliers can cost effectively produce, this is where PTP can help.

Component Assembly and Engine Build

PTP now offer a low volume assembly facility that can take raw components and build them into complete assemblies, this unique service can not only be used to compliment the low volume component supply we offer; but over the years has been developed into a service that will save you time and money.

Content © 2010 PTP - Website design and site framework © UK Websystems | Website Terms and Conditions of Use
Power Train Projects, Trinity House, Coventry Road, Hinckley, LE10 ONB email:sales@ptp-oe.co.uk